Portfolio

Post Chlorination

Design and permit a post chlorination tank for the municipal water treatment plant to provide chlorination as the last treatment process and to assure 5 minutes of chlorine contact time; assure compliance with the Groundwater Rule.  The tank was designed to maintain 1000 gpm flow throughout and was one of the first to be approved by the NJDEP Bureau of Safe Drinking Water.  We performed field survey, design, preparation of plans and specifications for public advertisement and prepared all loan application submissions necessary to obtain funding for the project through the NJ Environmental Infrastructure Trust.